Second Batch of Pharaoh pedals are completed and shipped

The 2nd batch of 6 Pharaoh pedals are built and shipped, bringing a conclusion to the 6-6 phase.

Second Batch of Pharaoh pedals are completed and shipped

The 2nd batch of 6 Pharaoh pedals are built and shipped, bringing a conclusion to the 6-6 phase.

→

The next batch of Pharaoh pedals are in the printing phase. They are screen printed with epoxy ink on a powder coated enclosure for maximum durability. The pink is the first custom order Pharaoh.

→

Alot of progress today.Pots installed,input jacks installed, most of the chassis wiring is in. Next step is the turretboard.

→

Alot of progress today.Pots installed,input jacks installed, most of the chassis wiring is in. Next step is the turretboard.